January 2026
Plumbing, electrical wiring, HVAC are installed. Drywall is being installed. Painting is set to begin.
December 2025
Lumber and Steel are installed to frame the exhibits and prepare for drywalling.
November 22nd 2025
Window infills are completed.
November 19th & 20th 2025
Lumber and steel framing is being installed indoors.
October 31st 2025
The footings form is in place and reinforcement bars are being prepared for concrete the following week.
October 21st 2025
Rudyard Electric is bringing conduit and MC Cable into the building to begin installation. Side walk pavers are being installed.
October 13th & 17th 2025
Belonga removes site paving. Trees are removed from the alley.
October 9th, 10th 2025
The water lines are being connected to the sewer downtown.
September 2025
Insulation is installed in the attic on the second floor’s southern wall.
September 2024
Electrical panels were installed, a trench was dug to place new electrical lines.
August 2024
Window installation and construction of the elevator shaft are completed, work on the stairways progresses, exterior doors installed, frames for the walls were built.
July 2024
Concrete work is completed, the elevator shaft is constructed with rooftop mechanical access installed, the stairway to the balcony is framed, and the windows on the main floor are installed.
June 2024
More supplies are brought in, the remaining entryway floor is removed, and a new concrete floor is poured. Outside, new plumbing outlets are installed.
May 2024
The new wall, stairs, and elevator frames are built and concrete is pumped, filling the frame with approximately 17 cubic yards of concrete. All windows at the front of the building are removed and work continues on the plumbing and stabilizing the second-floor balcony.
April 2024
The concrete floor of the front entry is removed. Trenches are dug and the foundation for a new wall, stairs, and elevator is framed.
March 2024
Complete interior demolition begins. Select areas of concrete are broken down for plumbing access and installation, new walls, supports for the mezzanine, and foundations for an elevator and stairs.
December 2020
Abatement is complete and the interior of main space has been taken down to the studs.
November 2020
Images taken prior to demolition and abatement.